Return to Governor's Proposed Transportation Program table of contents
Urban/Rural Mobility Program Project List Governor's Transportation Revenue Proposal Dollars in Thousands State Route Project Title Phase Project Cost District 1 Intelligent Transportation Systems CN 999.6 Reserve for 1997-99 Agency Request Projects 5 State Route 161 Interchange & State Route 18 Interchange PE 200.0 Design Analysis - Interchange Modifications 5 Northbound Downtown Rechannelization CN 1,088.8 Rechannelization ($17.8M Proviso) 5 220th St SW to 44th Avenue W PE 186.6 Northbound Auxiliary Lane 5 196th St SW/SR524 Interchange PE 100.0 Modifications - Phase B 5 196th St SW/SR524 Interchange CN 1,603.2 Modifications - Phase B 5 196th St SW (SR524) Interchange Phase C RW 42.8 Collector/Distributor Lanes 5 128th St SW (SR524) Interchange PE 26.4 Loop Ramps, HOV Bypass, Ramp Metering 5 172nd St NE (State Route 531) Interchange RW 1,338.0 Widen Structure to 5/6 Lanes 5 172nd St NE (State Route 531) Interchange CN 116.0 Widen Structure to 5/6 Lanes 5 Anderson Road to Cook Road - Design Analysis PE 135.0 5 Bellingham Vicinity - Major Investment Study PE 750.0 9 State Route 522 to 228th St. SE Stage 1 RW 591.5 Widen to Five Lanes 9 228th St. SE to 212th St. SE RW 540.7 Widen to Five Lanes - Stage 2 ($17.8M Proviso) 90 Sunset Interchange Modifications RW 2.0 Modify Existing Facility to Full Access 96 Junction 35th Avenue SE CN 100.0 Intersection Improvements 99 State Route 99 N - Battery St. Tunnel to N. 205th PE 248.5 Route Continuity Study 99 King/Snohomish County Line to State Route 525 Vicinity CN 2,231.0 Widening 161 Jovita Boulevard to South 360th St/Milton Road South RW 396.6 Widen to Five Lanes - Stage 2 ($17.8M Proviso) 161 Jovita Boulevard to South 360th St/Milton Road South CN 168.7 Widen to Five Lanes - Stage 2 ($17.8M Proviso List) 202 Vicinity Redhook Brewery to NE 85th St. PE 240.0 Planning Study - Widen, Channelization 202 Elk Sammamish Parkway to Sahalee Way PE 992.8 Additional Lanes 405 I-405 Corridor Major Investment Study & Predesign PE 414.1 509 I-5 to Des Moines Way 188th St. PE 2,199.1 New Alignment 520 State Route 520 Major Investment Study - I-5 to State Route 202 PE 1,242.5 522 State Route 5 to State Route 405 Multi-Modal Project RW 113.5 HOV Priority at Intersections ($17.8M Proviso) 522 State Route 5 to State Route 405 Multi-Modal Project CN 115.7 HOV Priority at Intersections ($17.8M Proviso) 522 State Route 9 to Paradise Lake Road CN 6,040.0 Widen to Four Lane Freeway New Interchange 524 24th Avenue SW to State Route 527 Widen to Five Lanes CN 797.8 Transportation Improvement Board Project - Snohomish Co 525 Swamp Creek Park & Ride Lot Stage 2 PE 210.6 Lot Expansion 525 State Route 99 Interchange CN 2,796.9 Construct Interchange, HOV Lanes 525 State Route 99 to State Route 526 Widen to Four Lanes CN 9,998.7 Transportation Improvement Board - Boeing 527 164th St. SE to 132nd St. SE PE 100.0 Widen to Five Lanes 527 164th St. SE to 132nd St. SE CN 1,172.8 Widen to Five Lanes 527 132nd St. SE to 112th St. SE Widen to Three Lanes RW 136.8 Transportation Improvement Board - Boeing 542 Orleans to Britton Road PE 297.2 542 Orleans to Britton Road RW 513.6 Total District 1 37,248.9 District 2 17 Pioneer to Stratford Road RW 330.4 Widen to Four Lane 17 Pioneer to Stratford Road CN 2,749.0 Widen to Four Lane Total District 2 3,079.4 District 3 3 State Route 3/State Route 303 Interchange (Waaga Way) Stage 1 RW 1,772.5 Realignment and Add Ramp 3 Shelton Alternate Route PE 200.0 Feasibility Study for a Couplet Or New Route 16 Gig Harbor Interchange CN 1,611.6 Construct Interchange 20 Port Townsend Two-Way Left Turn Lane Channelization PE 115.0 104 State Route 104 Corridor Traffic Circulation Improvements PE 300.0 Construct Additional Lanes and Signals 161 204th Street to 176th Street PE 140.0 Widen Existing 2 Lane to a 5 Lane Roadway 161 234th Street E to 204th Street E PE 140.0 Widen From 2 to 5 Lanes 167 State Route 509 to State Route 161 PE 3,000.0 Design Study 303 Bremerton to Silverdale PE 350.0 Major Investment Study 304 State Route 3 to Bremerton Ferry Terminal CN 1,000.0 Realignment and HOV Lane 410 214th Avenue E to 234th PE 475.0 Add 2 Lanes & Two Way Left Turn Lane 410 214th Avenue E to 234th RW 1,120.6 Add 2 Lanes & Two Way Left Turn Lane 410 234th to Hinkleman Ext. Road PE 503.9 Add Additional Lanes 410 234th to Hinkleman Ext. Road RW 1,359.0 Add Additional Lanes 410 Hinkleman Road to Park Avenue PE 300.0 Construct 2 Additional Lanes 510 State Route 5 to Martin Way RW 458.5 Widen From 2 Lanes to 5 Lanes 510 Martin Way to Pacific Avenue PE 290.0 Widen From 2 Lanes to 5 Lanes 510 Martin Way to Pacific Avenue RW 4,472.0 Widen From 2 Lanes to 5 Lanes Total District 3 17,608.4 District 4 5 Burnt Bridge Creek through NE 78th St CN 10,830.2 Reconstruct to 6 Lane South - Interchange at 78th 14 192nd Avenue Interchange (Brady Road) RW 1,000.0 Construct Interchange 14 192nd Avenue Interchange (Brady Road) CN 4,418.5 Construct Interchange 205 Fourth Plain Road South Bound On Ramp PE 300.0 Construct New On Ramp to State Route 205 432 3rd Avenue to Talley Way Interchange Design Study PE 100.0 Corridor Design Study 500 Ward Road to 162nd Avenue RW 461.8 Widen From 2 to 4 Lanes 500 Ward Road to 16th Avenue CN 2,788.5 Widen From 2 to 4 Lanes Total District 4 19,899.2 District 5 24 I-82 to Yakima River PE 500.0 Reconstruct Interchange & Additional Lanes 395 Kennewick/Pasco Vicinity PE 100.0 Corridor Design Study Total District 5 600.0 District 6 North Spokane Corridor - Phase 1 PE 2,000.0 State Route 395 to State Route 2 Design 90 Sprague Avenue to Argonne Road - Stage 2 CN 6,999.9 Provide Additional Lanes 90 Sullivan Road to Harvard Road PE 300.0 Provide Additional Lanes 90 Vicinity State Route 195 Interchange to Vicinity PE 500.0 Liberty Park Interchange - Corridor Analysis 90 Barker Road Interchange and Greenacres Interchange - Corridor Analysis PE 150 291 State Route 2 to Vicinity Indian Trail Road - Corridor Analysis PE 200.0 395 Hastings Road to Mile Post 172 - Stage 2 CN 7,200.0 Construct 2 Additional Lanes Total District 6 17,349.9 Rural Mobility Projects District 1 2 State Route 2/State Route 522 Monroe Bypass PE 746.7 Bypass Route Around City Of Monroe 2 State Route 2/State Route 522 Monroe Bypass RW 126.9 Bypass Route Around City Of Monroe 2 East Monroe to Deception Creek Bridge - Design Analysis PE 425.0 5 State Route 5, 9, 539, and 543 - Border Crossing Information - CN 2,222.5 at US/Canadian Border 5 North Bound Pace Lane Extension - Blaine Vicinity CN 2,546.3 Extend Pace Lane ($17.8M Proviso) 20 Deception Pass Vicinity to State Route 20 Spur - Corrridor Analysis PE 250.0 20 Fredonia to State Route 5 PE 1,535.9 Construct Four Lane Highway 20 Fredonia to State Route 5 RW 334.4 Construct Four Lane Highway 96 Seattle Hill Road to State Route 9 PE 561.4 Design Report and Enivronmental Impact Study 96 Seattle Hill Road to State Route 9 RW 153.5 Design Report and Environmental Impact Study 522 Paradise Lake Road to Snohomish River Stage 2 RW 384.9 Widen to 4 Lane 531 43rd Avenue NE to 67th Avenue NE RW 33.2 Widen to 5 Lanes 539 Horton Road to Tenmile Road RW 457.1 Widen to Five Lanes 539 Tenmile Road to International Boundary PE 428.7 Widening 539 Tenmile Road to International Boundary RW 200.8 Widening Total District 1 10,407.9 District 2 26 State Route 243 Intersection to Mile Post 5.5 Vicinity CN Construct Truck Climbing Lanes 26 State Route 243 Intersection to Mile Post 5.5 Vicinity PE 30.0 Construct Truck Climbing Lane 26 State Route 243 Intersection to Mile Post 5.5 Vicinity CN 2,387.5 Construct Truck Climbing Lane Total District 2 2,417.5 District 3 3 State Route 3/305 Interchange Vicinity PE 110.0 Horizontal & Vertical Alignment Access 3 State Route 3/305 Interchange Vicinity CN 360.1 Horizontal & Vertical Alignment Access 3 Belfair Vicinity CN 646.6 Construct Additional Lanes and Signal 5 Maytown Interchange to 93rd Avenue PE 100.0 SW Interchange 5th and 6th Lanes 5 Maytown Interchange to 93rd CN 4,030.8 Avenue SW Interchange - 5th and 6th Lanes 5 Grand Mound to Maytown Interchange PE 825.2 Construct 6th Lane 101 Dawley Road Vicinity to Blyn Highway RW 149.3 Construct Truck Climbing Lane 101 Dawley Road Vicinity to Blyn Highway CN 18.0 Construct Truck Climbing Lane 101 Gardiner Cemetery Road to Mile Post 277.6 CN 1,317.6 Construct Truck Climbing Lane 101 Port Angeles Alternate Route - Major Investment Study PE 300.0 101 Chicken Coop Road East Bound Passing/Truck Climbing Lane RW 30.0 101 Blyn Vicinity Passing Lanes RW 142.6 Construct East and Westbound Passing Lane 104 Hood Canal Bridge East Half PE 1,004.6 Bridge Replacement 104 State Route 19 Westbound PE 117.6 Construct Passing/Truck Climbing Lane 510 City Of Yelm Corridor Analysis PE 150.0 Total District 3 9,303.0 District 4 4 Svensen's Curve PE 120.0 Realignment 4 Svensen's Curve RW 344.4 Realignment 5 NE 134th St to NE 319th St Design Study PE 900.0 Prepare Corridor Design Study 101 Smith Creek Road Vicinity PE 450.0 Construct Climbing Lane and Realign Road 101 Smith Creek Road Vicinity RW 16.0 Construct Climbing Lane and Realign Road Total District 4 1,830.4 District 5 12 State Route 124 to Wallula PE 300.0 Corridor Design Study 82 Thrall Road to Manastash Ridge PE 600.0 Add Auxiliary Lane-Eastbound 90 Highline Canal to Elk Heights RW 210.9 Construct Auxiliary Lane-Eastbound 90 Elk Heights Vicinity to Taneum Creek Bridge. RW 88.0 Construct Auxiliary Lane-Westbound 90 Ryegrass Summit to Vantage RW 55.9 Construct Auxiliary Lane-Westbound 90 Snoqualmie Pass to Ellensburg PE 600.0 Corridor Design Study Total District 5 1,854.8 District 6 2 Vicinity State Route 206 to Vicinity Mile Post 299 PE 200.0 Corridor Analysis 195 Plaza to Spangle PE 30.0 Provide Additional Lanes 195 Pullman to Colfax PE 150.0 Corridor Analysis 270 Johnson Road to Idaho State Line PE 250.0 Additional Lanes 395 Vicinity Halfmoon Road to Hamilton Road PE 200.0 Provide Additional Lanes 395 Hamilton Road to Montgomery Road PE 200.0 Provide Additional Lanes 904 College Hill Road to State Route 90 PE 400.0 Provide Additional Lanes 904 College Hill Road to State Route 90 RW 75.0 Provide Additional Lanes Total District 6 1,505.0 Urban Bicycle Mobility Projects District 1 5 NE 117th Street (Northgate) - Bike Path PE 50.0 Bicycle and Pedestrian Path 5 NE 117th Street (Northgate) - Bike Path CN 93.3 Bicycle and Pedestrian Path 5 Interurban Trail Crossing Of State Route 524 PE 150.0 Pedestrian and Bike Path 5 Interurban Trail Crossing Of State Route 524 CN 237.2 Pedestrian and Bike Path 90 SE 136th Street Tunnel PE 30.0 Bicycle and Pedestrian Improvements 90 SE 136th Street Tunnel CN 60.3 Bicycle and Pedestrian Improvements 96 3rd Avenue SE to State Route 527 PE 201.0 Bike Lane 96 3rd Avenue SE to State Route 527 CN 304.1 Bike Lane 202 Sammamish River Bridge 202/38 PE 65.0 Bike, Equestrian and Pedestrian Trail 202 Sammamish River Bridge 202/38 CN 136.2 Bike, Equestrian, and Pedestrian Trail 520 State Route 520 Bike Path - Bellevue to Redmond CN 430.6 Bike Path - Freeway Only Alternative Total District 1 1,758.0 District 2 2 State Route 2 Odabashian Bridge Widening PE 150.0 Widen Bridge for Bike Path 2 State Route 2 Odabashian Bridge Widening CN 949.9 Widen Bridge for Bike Path Total District 2 1,099.9 District 3 5 Sleater-Kinney Road Undercrossing PE 142.5 Construct Bicycle/Pedestrian Bridge 5 Sleater-Kinney Road Undercrossing CN 758.5 Construct Bicycle/Pedestrian Bridge 5 Martin Way Overcrossing - Bike Lanes PE 110.0 Construct Bicycle/Pedestrian Lanes 5 Martin Way Overcrossing - Bike Lanes CN 586.0 Construct Bicycle/Pedestrian Lanes Total District 3 1,597.1 District 4 5 State Route 14 Pedestrian Undercrossing CN 1,000.2 Total District 4 1,000.2 District 5 12 16th Avenue Interchange PE 300.0 Widen Structure for Pedestrian/Bike 12 16th Avenue Interchange CN 600.0 Widen Structure for Pedestrian/Bike 24 State Route 82 to Keys Road PE 100.0 Widen Shoulders for Pedestrian/Bike 24 State Route 82 to Keys Road CN 800.0 Widen Shoulders for Pedestrian/Bike Total District 5 1,800.0 District 6 90 I-90 Corridor Bicycle Route Update PE 8.0 Update Signing and Guardrail at Urban Bike Trail 90 I-90 Corridor Bicycle Route Update CN 41.9 Update Signing and Guardrail at Urban Bike Trail Total District 6 49.9 HOV Mobility Projects District 1 5 Federal Way Park & Ride Lot #2 CN 7,249.1 5 Pierce County Line to Tukwila Interchange PE 2,064.2 HOV & Climbing Lanes 5 Pierce County Line to Tukwila Interchange PE 1,004.2 HOV & Climbing Lanes 5 Pierce County Line to Tukwila Interchange RW 30.6 HOV & Climbing Lanes 5 Pierce County Line to Tukwila Interchange RW 22.9 HOV & Climbing Lanes 5 Pierce County Line to Tukwila Interchange CN 16,503.4 HOV & Climbing Lanes 5 Pierce County Line to Tukwila Interchange CN 27,465.4 HOV & Climbing Lanes 5 Pierce County Line to Tukwila Interchange CN 3,117.2 HOV & Climbing Lanes 5 236th St SW to 164th St SW Interchange PE 624.6 HOV Lanes 5 236th St SW to 164th St SW Interchange RW 96.1 HOV Lanes 5 164th to State Route 526 - HOV Lanes CN 1,843.5 Both Directions 5 State Route 526 to State Route 2 PE 1,574.4 HOV Lanes 90 Junction Interstate 405 Interchange PE 4,463.3 Freeway to Freeway - SW, NE, NW Quadrant 90 Junction Interstate 405 Interchange PE 2,751.7 Freeway to Freeway - SW, NE, NW Quadrant 90 Junction Interstate 405 Interchange PE 3,405.7 Freeway to Freeway - SW, NE, NW Quadrant 167 15th St. SW to 15th St NW - Stage 3 RW 253.2 HOV Lanes 167 15th St. SW to 15th St NW - Stage 3 CN 78.4 HOV Lanes 405 Tukwila to Factoria PE 870.7 Surveillance Control & Driver Information 405 Tukwila to Factoria RW 41.3 Surveillance Control & Driver Information 90 Junction State Route 518 Interchange PE 4,018.2 Freeway to Freeway - Southbound to Westbound Ramp 405 Coal Creek Pkwy to SR5 HOV Lane Restriping CN 600.0 Move HOV Lane From Outside to Inside 405 Northup to Bothell CN 1,425.7 HOV Lanes 405 Bothell to Swamp Creek Interchange PE 32.0 Construct HOV Lanes, Both Directions 405 Bothell to Swamp Creek Interchange CN 19,650.0 Construct HOV Lanes, Both Directions 525 I-5 to State Route 99 PE 24.4 Complete Freeway - HOV Lanes With Boeing 525 I-5 to State Route 99 CN 11,606.5 Complete Freeway - HOV Lanes With Boeing 5 Pierce Co. Line to S. 272nd - Stage 4 RW 2,483.9 Construct Northbound & Southbound HOV Lanes From Pierce Co. Line 5 Pierce Co. Line to S. 272nd - Stage 4 CN 11,939.0 Construct Northbound & Southbound HOV Lanes From Pierce Co. Line 5 Port Of Tacoma Interchange PE 681.5 Construct HOV Lanes 5 Port Of Tacoma Interchange HOV Lanes RW 638.2 5 State Route 512 Interchange HOV Lanes PE 2,654.3 5 State Route 16 Interchange, 38th St Interchange PE 400.0 HOV Lanes 5 State Route 16 Interchange, 38th St E Interchange PE 3,777.0 HOV Lanes 5 State Route 16 Interchange, 38th St Interchange PE 713.2 HOV Lanes 5 Thompson Avenue to Pacific Avenue Undercrossing PE 200.0 HOV Lanes 5 Thompson Avenue to Pacific Avenue Undercrossing RW 216.8 HOV Lanes 5 Thompson Avenue to Pacific Avenue Undercrossing CN 14,998.5 HOV Lanes 5 East "L" St/Portland Avenue to Puyallup Rail Road Bridge RW 27.3 HOV Lanes 5 East "L" St/Portland Avenue to Puyallup Rail Road Bridge RW 531.9 HOV Lanes 5 Pierce County - Environmental Impact Study/Design Report PE 2,477.0 State Route 5 Corridor Study for HOV Lanes TOTAL 8,344.3 GRAND TOTAL $283,966.8