Department of Transportation
Owned Facilities by County - 1997-99
Project Map


Capital Overview


The Washington State Department of Transportation (DOT) ensures mobility through a multi-modal transportation system that meets the social, economic, and environmental needs of the state. The majority of the Department's budget is dedicated to transportation infrastructure construction or preservation.

Several modes of transportation are included in the agency's programs. The Washington State highway system is a network of 763 miles of interstate highways, 820 miles of non-interstate urban highways, and 5,453 miles of non-interstate rural highways. The Washington State Ferry System serves as a vital commercial link with the state's peninsula and islands. Each year nearly 25 million passengers and 11 million vehicles travel across Puget Sound using the fleet of 24 vessels and 20 terminals and docks. In addition, 17 state-operated airports are maintained in a condition permitting safe emergency use. To support these transportation programs, DOT owns facilities at522 sites with 691 buildings throughout the state.

DOT's operating and construction programs are budgeted through the state's operating budget process and presented in the transportation operating budget. Included in the capital budget are appropriations for continuing the construction of the three new jumbo ferries initiated during the current biennium, and highway maintenance and support facilities.. These two DOT capital programs are discussed in terms of the overall state capital program in this document; however, the summary tables for agency capital projects shown later do not include the appropriations for the transportation programs discussed here since these programs are included in the transportation budget.

Ferry System Capital Program

Present ferry system operations were developed as a substitute for bridges carrying freight and people from one side of Puget Sound to the other. Ferry vessels provide passenger and car transport. As congestion and rising commuter demand has increased, the ferry system has responded with improvements that link passengers with buses, vanpools, trolleys, and pedestrian modes on both sides of the sound. The terminals provide park-and-ride facilities, transfer centers, passenger waiting areas, and ticketing facilities. The ferry system is committed to comprehensive vessel renovation programs to modernize equipment, and replace the electric steel class of vessels.

In 1992, a bond authorization was approved to finance the construction of three Mark II Jumbo ferry vessels. The total cost for the three vessels is approximately $249 million. The first vessel, the M.V. Tacoma, is scheduled to begin service in time for the 1997 summer season. The second and third vessels will be in service by summer, 1998 and summer, 1999, respectively.

Major challenges facing the ferry system are related to aging facilities, regulatory impacts, and population growth in the Puget Sound area. Vehicle Ridership has grown 15 percent in the past five years and is expected to increase by another 15 percent by the year 2000. Total passengers are expected to reach 27.5 million by the end of this century. Many of the terminal facilities are timber pile construction that are nearing the end of their useful life and need to be replaced with steel and concrete construction. Implementation of new U.S. Coast Guard regulations regarding lifesaving equipment aboard Washington State Ferry vessels are being assessed.

Capital Facilities Program

The capital facilities program provides safe, reliable facilities, with adequate space to house staff and equipment so that the department may plan, design, construct, operate, and maintain the state transportation system. There are three major types of facilities. Regional office complexes are the hub of planning, design, construction, and maintenance functions for each of the six designated transportation regions. The 25 maintenance area headquarters house the administrative, supervisory, and resource centers in support of the maintenance programs. Maintenance section facilities are the home base for the daily roadway maintenance functions performed by the state crews. There currently are 94 section facilities along state highways. Additional facilities provided by the capital facilities program include 12 buildings housing highway construction project engineer offices.

The Department has a 20-year plan which calls for upgrading the inventory of facilities to a target standard level by the end of this period. The major challenge facing the capital facilities program in efforts to reach this objective is the increasing obsolescence of a large portion of the inventory of buildings due to age, location, and size.


Capital Plan Highlights


Washington State Ferry System

Capital Facilities


1997-99 Agency Detail
Marine Transportation
93-2-062
Jumbo Class Ferries
The second and third jumbo Mark II ferries will be completed and placed in service in the 1997-99 biennium.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
513,008 141,465,000 69,486,000 999,000 212,463,008
Phase Start Date / End Date Phase Cost
PreDesign 05-07-93 / 07-31-94 56,100
Design 07-01-93 / 11-21-96 14,515,000
Construction 02-21-95 / 02-28-99 197,891,908
Funds: Puget Sound Capital Construction Account - State 212,463,008
96-2-310
Ferry System Preservation and Program Projects
Funding is provided to refurbish, renovate, repair vessels, improve terminals, docks, buildings, parking lots and grounds, and to perform other projects related to increasing service levels.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
513,008 141,465,000 134,147,000 683,693,000 959,818,008
Phase Start Date / End Date Phase Cost
PreDesign 05-07-93 / 07-31-94 56,100
Design 07-01-93 / 11-21-96 14,515,000
Construction 02-21-95 / 02-28-99 197,891,908
Funds: Puget Sound Capital Construction Account - Federal 57,155,000
Puget Sound Capital Construction Account - State 902,077,008
Passenger Ferry Account - State 586,000
98-2-001
State Route 519 Access Project
Funds are provided to address multi-modal terminal needs at Colman Dock in conjunction with the Kingdome/State Route 519 access project.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
586,000 586,000
Funds: Puget Sound Capital Construction Account - State 586,000

1997-99 Agency Detail
Highway Management And Facilities
98-2-001
Statewide Regional HQ Complexes
This project provides funding to implement a 20-year phased replacement to address new acquisitions, design and construction of new facilities or reconstruction of existing facilities.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
5,980,411 15,139,377 21,119,788
Phase Start Date / End Date Phase Cost
PreDesign 07-01-97 / 06-30-07 100,000
Design 07-01-97 / 06-30-07 1,782,650
Construction 07-01-97 / 06-30-07 19,237,134
Funds: Transportation Capital Facilities Account - State 21,119,788
98-2-002
Statewide Area Maintenance Facilities
This project implements a plan to address new acquisitions, facility design, and construction of new facilities or reconstruction of existing facilities.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
12,562,000 7,832,854 2,521,532 19,207,184 42,123,570
Phase Start Date / End Date Phase Cost
PreDesign 07-01-97 / 06-30-07 150,000
Design 07-01-97 / 06-30-07 2,071,464
Construction 07-01-97 / 06-30-07 13,663,687
Other 07-01-97 / 06-30-07 4,233,333
Funds: Transportation Capital Facilities Account - State 42,123,570
98-2-003
Statewide Maintenance Section Facilities
This project provides funding to remedy deficiencies in life/safety, building primary and service systems, functional obsolescence and lack of required environmental systems. Several of these projects will consolidate two or more roadway maintenance crews at one location, resulting in increased efficiency.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
2,349,000 1,318,871 2,929,496 14,477,847 21,075,214
Phase Start Date / End Date Phase Cost
PreDesign 07-01-97 / 06-30-07 200,000
Design 07-01-97 / 06-30-07 1,500,423
Construction 07-01-97 / 06-30-07 15,573,631
Other 07-01-97 / 06-30-07 133,333
Funds: Transportation Capital Facilities Account - State 21,075,214
98-2-004
Statewide Major Upgrade Projects
This project upgrades facilities to meet current requirements for staff, equipment, materials, and for environmental compliance.
.
Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Cost
3,759,124 13,926,606 17,685,730
Phase Start Date / End Date Phase Cost
PreDesign 07-01-97 / 06-30-07 286,667
Design 07-01-97 / 06-30-07 1,873,392
Construction 07-01-97 / 06-30-07 18,608,717
Funds: Transportation Capital Facilities Account - State 17,685,730